Fletcher Mine and Mill safety activity
MSHA violations, accident reports and inspections.
Safety activity
Main and booster fans.
30 CFR 57.8518(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty
Handling of materials
Days restricted activity only
Accident narrative
EMPLOYEE WAS MOVING A OIL TOTE FROM UNDER A HAUL TRUCK WHEN THEY LOST BALANCE ON LEFT LEG. THEY WENT TO SUPPORT THEMSELVES WITH RIGHT LEG AND IT GAVE OUT CAUSING THEM TO FALL INTO THE TRUCK TIRE ON THE LEFT SIDE OF THEIR HEAD AND EAR.
Other
No dys awy frm wrk,no rstr act
Accident narrative
EMPLOYEE WAS STEPPING DOWN INTO THE MINI X 303.5 TO BE SEATED. WHEN EE STEPPED DOWN ALL OF EE'S WEIGHT WAS ON EE'S LEFT HIP AND IT POPPED CAUSING SEVERE PAIN. EMPLOYEE WAS ISSUED A PRESCRIPTION MEDICATION MAKING THIS REPORTABLE. EE WAS NEVER PUT ON LIGHT DUTY.
Spillage and leakage.
30 CFR 57.4102 · $267.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $313.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $177.00 proposed penalty
Escapeways and refuges.
30 CFR 57.11050(a) · $592.00 proposed penalty
Oxygen cylinder storage.
30 CFR 57.4601 · $151.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 57.14207 · $267.00 proposed penalty
Air receiver tanks.
30 CFR 57.13011 · $267.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $336.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $592.00 proposed penalty
Warning signs.
30 CFR 57.4101 · $267.00 proposed penalty
Combustible waste.
30 CFR 57.4104(a) · $267.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $267.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $267.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $336.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $267.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $1,126.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $267.00 proposed penalty
Inspection.
30 CFR 57.4201 · $151.00 proposed penalty
Combustible waste.
30 CFR 57.4104(b)(2) · $267.00 proposed penalty
Guarding electrical connections and resistor grids.
30 CFR 57.12023 · $592.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.