Excel #5 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Spot Inspections
103(i) · 3.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Regular Safety and Health Inspection
539.0 on-site hours reported
Spot Inspection
3.0 on-site hours reported
Spot Inspection
1.0 on-site hours reported
Spot Inspections
103(i) · 4.5 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $549.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was on top of the bolter on knees sliding plates across the bolter. They twisted and felt a pain in their back.
Methane monitors.
30 CFR 75.342(a)(4) · $226.00 proposed penalty
Non-Injury Accident Investigation
13.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Violation — cited standard not reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
Employee was using a multiplier to remove lug bolts from a scoop. The socket shattered causing EE's hand to slip and hit EE's arm. This caused a laceration that required stitches.
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
A roof fall was found during the weekly exam. The location was panel SC-2 #10 entry, 1 break up and 1 break to the left of spad 370. All entries in the panel are common return.
Rehabilitation of areas with unsupported roof.
30 CFR 75.212(c) · $313.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(a)(1)(i) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.