← Elk Creek Surface

Elk Creek Surface safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F01A1FE

    6.0 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F000B23

    43.0 on-site hours reported

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880584

    30 CFR 77.1606(c) · $336.00 proposed penalty

  4. Examination and maintenance of firefighting equipment.

    violationRecord 9880583

    30 CFR 77.1110 · $151.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880582

    30 CFR 77.1606(c) · $755.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 9880581

    30 CFR 77.1605(a) · $151.00 proposed penalty

  7. Accumulations of combustible materials.

    violationRecord 9880580

    30 CFR 77.1104 · $151.00 proposed penalty

  8. Accumulations of combustible materials.

    violationRecord 9880579

    30 CFR 77.1104 · $151.00 proposed penalty

  9. Drilling; general.

    violationRecord 9880578

    30 CFR 77.1007(b) · $151.00 proposed penalty

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880577

    30 CFR 77.1606(c) · $336.00 proposed penalty

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880576

    30 CFR 77.1606(c) · $465.00 proposed penalty

  12. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880575

    30 CFR 77.1606(c) · $465.00 proposed penalty

  13. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880574

    30 CFR 77.1606(c) · $465.00 proposed penalty

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880573

    30 CFR 77.1606(c) · $465.00 proposed penalty

  15. Accumulations of combustible materials.

    violationRecord 9880572

    30 CFR 77.1104 · $151.00 proposed penalty

  16. Loading and haulage equipment; installations.

    violationRecord 9880571

    30 CFR 77.1605(a) · $151.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880570

    30 CFR 77.1606(c) · $465.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880569

    30 CFR 77.1606(c) · $313.00 proposed penalty

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880568

    30 CFR 77.1606(c) · $313.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880567

    30 CFR 77.1606(c) · $3,448.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F000B13

    93.5 on-site hours reported

  22. Loading and haulage equipment; installations.

    violationRecord 9880510

    30 CFR 77.1605(d) · $151.00 proposed penalty

  23. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9880509

    30 CFR 77.1606(c) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.