Safety activity
Regular Safety and Health Inspection
65.8 on-site hours reported
Identification of power switches.
30 CFR 56.12018 · $366.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $366.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $209.00 proposed penalty
High-pressure hose connections.
30 CFR 56.13021 · $336.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,126.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $1,126.00 proposed penalty
Grounding circuit enclosures.
30 CFR 56.12025 · $336.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $1,818.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $1,818.00 proposed penalty
Regular Safety and Health Inspection
41.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $504.00 proposed penalty
Compliance Follow-up Inspection
3.0 on-site hours reported
Inspection and cover plates.
30 CFR 56.12032 · $177.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(1) · $177.00 proposed penalty
Correction of dangerous conditions.
30 CFR 56.12030 · $177.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $504.00 proposed penalty
Guarding electrical connections and resistor grids.
30 CFR 56.12023 · $177.00 proposed penalty
Smoking and use of open flames.
30 CFR 56.4100(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Use restrictions.
30 CFR 56.4400(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Investigation.
30 CFR 50.11(b)(7) · $151.00 proposed penalty
Guarding around lights.
30 CFR 56.12034 · $177.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(2) · $177.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $177.00 proposed penalty
Inspection.
30 CFR 56.4201(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.