EDM No. 1 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Smoking; prohibition.
30 CFR 75.1702 · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
5.5 on-site hours reported
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
30 CFR 50.20(a) · $151.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
30 CFR 75.363(a) · $336.00 proposed penalty
Other
No dys awy frm wrk,no rstr act
Accident narrative
Employee stated on 5/6/25 to co-worker that EE had injured disk in EE's neck and back prior to coming to work for EDM No. 1 Mine. EE finished shift and talked to several people at the mine prior to leaving mine site. EE has not reported accident to management so time of accident and nature of injury has not been determined.
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Quarterly sampling; designated areas.
30 CFR 70.209(a) · $226.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Regular Safety and Health Inspection
88.0 on-site hours reported
Mine map.
30 CFR 75.1200 · $151.00 proposed penalty
Health Technical Investigation
0.0 on-site hours reported
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $1,219.00 proposed penalty
Violation — cited standard not reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.