← EAGLE #3 MINE

EAGLE #3 MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mobile equipment; automatic warning devices.

    violationRecord 5095149

    30 CFR 77.410(c) · $151.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5095148

    30 CFR 77.1606(c) · $151.00 proposed penalty

  3. Verbal Hazard Complaint Inspections

    inspectionRecord F01FF34

    6.8 on-site hours reported

  4. Verbal Hazard Complaint Inspections

    inspectionRecord F01FF31

    3.5 on-site hours reported

  5. Verbal Hazard Complaint Inspections

    inspectionRecord 6322442

    3.5 on-site hours reported

  6. Verbal Hazard Complaint Inspections

    inspectionRecord 6322440

    6.5 on-site hours reported

  7. Verbal Hazard Complaint Inspections

    inspectionRecord 6322285

    8.5 on-site hours reported

  8. Mine ventilation plan; submission and approval.

    violationRecord 5027826

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F03218D

    6.0 on-site hours reported

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5095112

    30 CFR 77.1606(c) · $151.00 proposed penalty

  11. Loading and haulage equipment; installations.

    violationRecord 5095111

    30 CFR 77.1605(b) · $151.00 proposed penalty

  12. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5095110

    30 CFR 77.1606(c) · $151.00 proposed penalty

  13. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5028539

    30 CFR 77.1606(c) · $151.00 proposed penalty

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5028538

    30 CFR 77.1606(c) · $151.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5028537

    30 CFR 77.1606(c) · $151.00 proposed penalty

  16. Non-Fatal Accident Investigation

    inspectionRecord F006F0F

    5.0 on-site hours reported

  17. Power wires and cables; insulation and protection.

    violationRecord 5023499

    30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5028536

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  19. Condition and examination of firefighting equipment.

    violationRecord 5028535

    30 CFR 75.1100-3 · $151.00 proposed penalty

  20. Quantity and location of firefighting equipment.

    violationRecord 5028534

    30 CFR 75.1100-2(e) · $151.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5028533

    30 CFR 75.1731(a) · $209.00 proposed penalty

  22. Atmospheric monitoring systems.

    violationRecord 5028532

    30 CFR 75.351(n)(3)(i) · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5028531

    30 CFR 75.202(a) · $267.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5028530

    30 CFR 75.512 · $1,320.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5028529

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.