  1. Roof Control Technical Investigation

    inspectionRecord F007070

    7.0 on-site hours reported

  2. Power wires and cables; insulation and protection.

    violationRecord 9605456

    30 CFR 75.517 · Significant and substantial (S&S) · $755.00 proposed penalty

  3. Main mine fan examinations and records.

    violationRecord 9605453

    30 CFR 75.312(e) · $151.00 proposed penalty

  4. Ventilation Technical Investigation

    inspectionRecord F0154E2

    12.0 on-site hours reported

  5. Ventilation controls.

    violationRecord 9605449

    30 CFR 75.333(e)(1)(i) · $151.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 9605448

    30 CFR 75.370(a)(1) · $165.00 proposed penalty

  7. Inspection and cover plates.

    violationRecord 9607261

    30 CFR 77.512 · Significant and substantial (S&S) · $755.00 proposed penalty

  8. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9607260

    30 CFR 75.1909(b)(4) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F02DA2D

    206.0 on-site hours reported

  10. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 9603461

    30 CFR 75.1714-3(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 9603453

    30 CFR 75.512 · $151.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603452

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Electric equipment; examination, testing and maintenance.

    violationRecord 9603446

    30 CFR 75.512 · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord 6245638

    166.8 on-site hours reported

  15. Loading and haulage equipment; installations.

    violationRecord 9603247

    30 CFR 77.1605(k) · $336.00 proposed penalty

  16. Inspection of fire suppression devices.

    violationRecord 9603244

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  17. Roof Control Technical Investigation

    inspectionRecord F00F8B5

    7.5 on-site hours reported

  18. Ventilation Technical Investigation

    inspectionRecord F0154B6

    11.0 on-site hours reported

  19. Temporary notations, revisions, and supplements.

    violationRecord 9207669

    30 CFR 75.1202 · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9603243

    30 CFR 75.400 · $151.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603242

    30 CFR 75.1731(b) · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord 6232606

    96.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.