← Dunn Construction

Dunn Construction safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Verbal Hazard Complaint Inspections

    inspectionRecord F04322A

    8.0 on-site hours reported

  2. Electrical conductors.

    violationRecord 5065611

    30 CFR 56.12004 · $151.00 proposed penalty

  3. Handrails and toeboards.

    violationRecord 5065610

    30 CFR 56.11002 · $151.00 proposed penalty

  4. Moving machine parts.

    violationRecord 5065609

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  5. Moving machine parts.

    violationRecord 5065604

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F041084

    8.0 on-site hours reported

  7. Compliance Follow-up Inspection

    inspectionRecord F031584

    1.8 on-site hours reported

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F031582

    3.0 on-site hours reported

  9. Moving machine parts.

    violationRecord 5064739

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  10. Moving machine parts.

    violationRecord 5064738

    30 CFR 56.14107(a) · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F01C2C7

    3.0 on-site hours reported

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F01C2C6

    1.0 on-site hours reported

  13. Spot Inspection

    inspectionRecord F02A330

    12.5 on-site hours reported

  14. Regular Safety and Health Inspection

    inspectionRecord F0190D7

    5.5 on-site hours reported

  15. Changes; notification by operator.

    violationRecord 9827767

    30 CFR 41.12 · $151.00 proposed penalty

  16. Moving machine parts.

    violationRecord 9827766

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.