← Deer Run Mine

Deer Run Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5015058

    30 CFR 75.202(a) · $226.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5015057

    30 CFR 75.400 · $336.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5015245

    30 CFR 75.512 · $193.00 proposed penalty

  4. Electrical connections or splices; suitability.

    violationRecord 5015244

    30 CFR 75.514 · $193.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F0110CA

    103(i) · 6.0 on-site hours reported

  6. Accumulation of combustible materials.

    violationRecord 5015243

    30 CFR 75.400 · $336.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5015242

    30 CFR 75.400 · $336.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5015241

    30 CFR 75.400 · $336.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F0110C9

    103(i) · 8.0 on-site hours reported

  10. Roof control plan.

    violationRecord 5015240

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $32,395.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5015239

    30 CFR 75.1725(c) · Significant and substantial (S&S) · $25,484.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5015238

    30 CFR 75.400 · $336.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5015237

    30 CFR 75.400 · $336.00 proposed penalty

  14. Roof Control Technical Investigation

    inspectionRecord F0396F9

    24.5 on-site hours reported

  15. Quarterly sampling; designated areas.

    violationRecord 9781734

    30 CFR 70.209(a) · $959.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5015236

    30 CFR 75.1731(b) · $193.00 proposed penalty

  17. Weekly examination.

    violationRecord 5015235

    30 CFR 75.364(g) · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F0110C7

    103(i) · 6.0 on-site hours reported

  19. Regular Safety and Health Inspection

    inspectionRecord F0110C8

    253.0 on-site hours reported

  20. Spot Inspections

    inspectionRecord F00BE16

    103(i) · 7.0 on-site hours reported

  21. Machinery and equipment; operation and maintenance.

    violationRecord 9781490

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 9781489

    30 CFR 77.404(a) · $288.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F00BE13

    103(i) · 6.0 on-site hours reported

  24. Handtools (nonpowered)

    accidentRecord 220253430001

    No dys awy frm wrk,no rstr act

    Accident narrative

    IE was cutting a piece of wood with EE's knife when the blade slipped and cut self. IE received 6 sutures.

  25. Protection of trailing cables.

    violationRecord 9781485

    30 CFR 75.606 · Significant and substantial (S&S) · $3,184.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.