Deer Run Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Spot Inspections
103(i) · 4.0 on-site hours reported
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(j) · $193.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $398.00 proposed penalty
Testing, examination and maintenance.
30 CFR 75.821(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(c) · Significant and substantial (S&S) · $11,744.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
IE was putting a come along on the Shear and smashed EE's index finger. IE received 4 sutures.
Regular Safety and Health Inspection
308.0 on-site hours reported
Spot Inspections
103(i) · 8.0 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Spot Inspection
9.5 on-site hours reported
Spot Inspections
103(i) · 7.0 on-site hours reported
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
IE cut a finger when a drill steel was pulled out of the hole and hit their little finger against the drill pod.
Roof control plan.
30 CFR 75.220(a)(1) · $193.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(e) · $642.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $313.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(e) · $288.00 proposed penalty
Spot Inspections
103(i) · 4.0 on-site hours reported
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Self-rescue devices; use and location requirements.
30 CFR 75.1714-2(b) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.