  1. Regular Safety and Health Inspection

    inspectionRecord 6949071

    7.3 on-site hours reported

  2. Moving machine parts.

    violationRecord 5052895

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Construction and maintenance of guards.

    violationRecord 5052894

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  4. Inspection.

    violationRecord 5052893

    30 CFR 56.4201(a)(2) · $245.00 proposed penalty

  5. Electrical conductors.

    violationRecord 5052848

    30 CFR 56.12004 · $642.00 proposed penalty

  6. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6858842

    3.5 on-site hours reported

  7. Regular Safety and Health Inspection

    inspectionRecord 6858843

    11.5 on-site hours reported

  8. Insulation and fittings for power wires and cables.

    violationRecord 5059562

    30 CFR 57.12008 · $288.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F0047F3

    2.5 on-site hours reported

  10. Compliance Follow-up Inspection

    inspectionRecord F022CA5

    1.0 on-site hours reported

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F022CA6

    0.5 on-site hours reported

  12. Brakes.

    violationRecord 5055075

    30 CFR 56.14101(a)(3) · $193.00 proposed penalty

  13. Brakes.

    violationRecord 5055074

    30 CFR 56.14101(a)(2) · $642.00 proposed penalty

  14. Examination of working places.

    violationRecord 5055073

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $10,569.00 proposed penalty

  15. Testing grounding systems.

    violationRecord 5055072

    30 CFR 56.12028 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  16. New miner training.

    violationRecord 5055071

    30 CFR 46.5(b)(4) · Significant and substantial (S&S) · $3,538.00 proposed penalty

  17. Records of training.

    violationRecord 5055070

    30 CFR 46.9(g) · $151.00 proposed penalty

  18. Requirements for written safety program.

    violationRecord 5055069

    30 CFR 56.23003(c) · $151.00 proposed penalty

  19. Requirements for written safety program.

    violationRecord 5055068

    30 CFR 56.23003(b) · $151.00 proposed penalty

  20. Inspection and cover plates.

    violationRecord 5055067

    30 CFR 56.12032 · $642.00 proposed penalty

  21. Electrical conductors.

    violationRecord 5055066

    30 CFR 56.12004 · $642.00 proposed penalty

  22. Electrical conductors.

    violationRecord 5055065

    30 CFR 56.12004 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  23. Eye protection.

    violationRecord 5055064

    30 CFR 56.15004 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  24. Electrical conductors.

    violationRecord 5055063

    30 CFR 56.12004 · $642.00 proposed penalty

  25. Moving machine parts.

    violationRecord 5055062

    30 CFR 56.14107(a) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.