← Crucible Deep Mine

Crucible Deep Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5130991

    30 CFR 75.333(c) · $151.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 5130990

    30 CFR 75.503 · $151.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5130989

    30 CFR 75.1725(a) · $432.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5130988

    30 CFR 75.333(c)(2) · $151.00 proposed penalty

  5. Other safeguards.

    violationRecord 5130987

    30 CFR 75.1403

  6. Accumulation of combustible materials.

    violationRecord 5130986

    30 CFR 75.400 · $209.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5130985

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  8. Ventilation controls.

    violationRecord 5130984

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  9. Escapeways; bituminous and lignite mines.

    violationRecord 5130983

    30 CFR 75.380(d)(7)(vi) · $1,320.00 proposed penalty

  10. Insulating mats at power switches.

    violationRecord 5130982

    30 CFR 77.513 · $336.00 proposed penalty

  11. Ventilation controls.

    violationRecord 9839669

    30 CFR 75.333(d)(3) · $226.00 proposed penalty

  12. Preshift examination at fixed intervals.

    violationRecord 9839668

    30 CFR 75.360(c)(3)(ii) · $226.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 9839667

    30 CFR 75.370(f)(3) · $226.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F006C8A

    183.8 on-site hours reported

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5091995

    30 CFR 75.1725(a) · $504.00 proposed penalty

  16. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5091994

    30 CFR 75.1107-4(a)(1) · $151.00 proposed penalty

  17. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5091993

    30 CFR 75.1714-4(b) · $755.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5091992

    30 CFR 75.202(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5091991

    30 CFR 75.512 · $398.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 5091990

    30 CFR 75.503 · $165.00 proposed penalty

  21. Mechanical equipment guards.

    violationRecord 5091989

    30 CFR 75.1722(a) · $151.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 5091988

    30 CFR 72.630(b) · $1,818.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5091987

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5091986

    30 CFR 75.400 · $209.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5091985

    30 CFR 75.512 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.