← County Line Mine

County Line Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F04871E

    4.5 on-site hours reported

  2. Requirement for container labels.

    violationRecord 5108324

    30 CFR 47.41(a)

  3. Securing gas cylinders.

    violationRecord 5108323

    30 CFR 56.16005

  4. Regular Safety and Health Inspection

    inspectionRecord F025515

    16.0 on-site hours reported

  5. Grounding circuit enclosures.

    violationRecord 5103755

    30 CFR 56.12025 · $151.00 proposed penalty

  6. Combustible waste.

    violationRecord 5103754

    30 CFR 56.4104(a) · $151.00 proposed penalty

  7. Requirement for container labels.

    violationRecord 5103753

    30 CFR 47.41(a)(1) · $151.00 proposed penalty

  8. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5103752

    30 CFR 50.30(a) · $151.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F02550F

    2.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.