Continental Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Identification of power switches.
30 CFR 56.12018
Identification of power switches.
30 CFR 56.12018
Combustible waste.
30 CFR 56.4104(b)
Impoundment Spot Inspection
0.0 on-site hours reported
Electrical conductors.
30 CFR 56.12004
Electrical conductors.
30 CFR 56.12004
Grounding circuit enclosures.
30 CFR 56.12025
Housekeeping.
30 CFR 56.20003(a)
Grounding circuit enclosures.
30 CFR 56.12025
Electrical conductors.
30 CFR 56.12004
Requirement for container labels.
30 CFR 47.41(a)(1)
Combustible waste.
30 CFR 56.4104(b)
High-pressure hose connections.
30 CFR 56.13021
Requirements for written safety program.
30 CFR 56.23003(a)
Berms or guardrails.
30 CFR 56.9300(a)
Regular Safety and Health Inspection
20.5 on-site hours reported
Disorders (repeated trauma)
Occupatnal illness not deg 1-6
Accident narrative
Annual audiometric survey has indicated a reportable hearing loss for this employee.
Compliance Follow-up Inspection
2.0 on-site hours reported
Spot Inspection
14.8 on-site hours reported
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $151.00 proposed penalty
Spillage and leakage.
30 CFR 56.4102 · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 56.3200 · $151.00 proposed penalty
Impoundment Spot Inspection
2.0 on-site hours reported
Emergency communications system.
30 CFR 56.18013 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.