← Coalgood Darby 1

Coalgood Darby 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulations of combustible materials.

    violationRecord 5086049

    30 CFR 77.1104 · Significant and substantial (S&S) · $252.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5086048

    30 CFR 77.1606(c) · $168.00 proposed penalty

  3. Loading and haulage equipment; installations.

    violationRecord 5086047

    30 CFR 77.1605(a) · $168.00 proposed penalty

  4. Mechanical equipment guards.

    violationRecord 5086045

    30 CFR 77.400(c) · Significant and substantial (S&S) · $336.00 proposed penalty

  5. Travelways at surface installations.

    violationRecord 5086044

    30 CFR 77.205(b) · Significant and substantial (S&S) · $226.00 proposed penalty

  6. Main mine fan operation.

    violationRecord 5086043

    30 CFR 75.311(f) · $151.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5086042

    30 CFR 75.503 · $151.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 5086041

    30 CFR 75.380(d)(7)(v) · $151.00 proposed penalty

  9. Escapeways; bituminous and lignite mines.

    violationRecord 5086040

    30 CFR 75.380(d)(1) · $151.00 proposed penalty

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5086016

    30 CFR 77.1606(c)

  11. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5086015

    30 CFR 75.1101-10 · $151.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5086014

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5086013

    30 CFR 75.701 · $151.00 proposed penalty

  14. Short circuit protection of trailing cables.

    violationRecord 5086012

    30 CFR 75.601 · $151.00 proposed penalty

  15. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5086011

    30 CFR 75.601-1 · $151.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5086005

    30 CFR 77.1606(c) · $168.00 proposed penalty

  17. Roof control plan.

    violationRecord 5086004

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 5086003

    30 CFR 75.380(d)(1) · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord 6973686

    127.5 on-site hours reported

  20. Installation of main mine fans.

    violationRecord 9779241

    30 CFR 75.310(c)(4)(ii) · $151.00 proposed penalty

  21. Inspection of fire suppression devices.

    violationRecord 9779240

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  22. Temporary notations, revisions, and supplements.

    violationRecord 9779239

    30 CFR 75.1202-1(a) · $151.00 proposed penalty

  23. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 9779238

    30 CFR 75.1712-3(a) · $151.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F005109

    4.0 on-site hours reported

  25. Regular Safety and Health Inspection

    inspectionRecord F003CDB

    36.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.