Coal Mountain No 1 Surface safety activity
MSHA violations, accident reports and inspections.
Safety activity
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Drilling; general.
30 CFR 77.1007(b) · $177.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $755.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
30 CFR 48.27(a)(2)(ii) · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $336.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $755.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · $755.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
30 CFR 72.620 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
The driver stated while tightening the lug nuts, EE had pressure on EE's left foot and EE's right foot was 6-8 inches off the ground while EE was applying pressure to the breaker bar. At that time, the breaker bar broke and EE fell over sideways causing EE's right leg to break above the ankle.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.