← Coal Branch No.1 Mine

Coal Branch No.1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Violation — cited standard not reported

    violationRecord 5024154

    Significant and substantial (S&S) · $58,171.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025370

    30 CFR 77.1606(c) · $245.00 proposed penalty

  3. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5024153

    30 CFR 75.1107-1(b) · $366.00 proposed penalty

  4. Deenergization of self-propelled electric face equipment; performance requirements.

    violationRecord 5024152

    30 CFR 75.523-2(a)(1) · $366.00 proposed penalty

  5. Automatic emergency-parking brakes.

    violationRecord 5024151

    30 CFR 75.523-3(c)(1) · $245.00 proposed penalty

  6. Verbal Hazard Complaint Inspections

    inspectionRecord F00BE5E

    6.5 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 5024150

    30 CFR 75.400 · $2,503.00 proposed penalty

  8. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5024149

    30 CFR 75.1712-3(a) · $151.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5024148

    30 CFR 75.512 · $592.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord 6321888

    6.5 on-site hours reported

  11. Self-rescue devices; use and location requirements.

    violationRecord 5024147

    30 CFR 75.1714-2(f) · $193.00 proposed penalty

  12. Machinery and equipment; operation and maintenance.

    violationRecord 5024146

    30 CFR 75.1725(a) · $3,736.00 proposed penalty

  13. Other safeguards.

    violationRecord 5024145

    30 CFR 75.1403 · $1,431.00 proposed penalty

  14. Communications facilities; refuge alternatives.

    violationRecord 5024144

    30 CFR 75.1600-3(a) · $959.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 5024143

    30 CFR 75.380(d)(1) · $4,749.00 proposed penalty

  16. Escapeway maps.

    violationRecord 5024142

    30 CFR 75.1505(b) · $1,037.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5024141

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  18. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5024140

    30 CFR 75.1731(a) · $818.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord 6321600

    153.3 on-site hours reported

  20. Verbal Hazard Complaint Inspections

    inspectionRecord 6321159

    7.0 on-site hours reported

  21. Machinery and equipment; operation and maintenance.

    violationRecord 5024139

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 5024138

    30 CFR 75.512 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  23. Verbal Hazard Complaint Inspections

    inspectionRecord 6319294

    5.5 on-site hours reported

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5025258

    30 CFR 75.1731(b) · $209.00 proposed penalty

  25. Mechanical equipment guards.

    violationRecord 5025257

    30 CFR 75.1722(c) · $313.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.