← Clifton Plant

Clifton Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5250040

    30 CFR 50.30(a) · $151.00 proposed penalty

  2. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5250039

    30 CFR 50.30(a) · $151.00 proposed penalty

  3. Moving machine parts.

    violationRecord 5176981

    30 CFR 56.14107(a) · Significant and substantial (S&S)

  4. Moving machine parts.

    violationRecord 5176980

    30 CFR 56.14107(a)

  5. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5250038

    30 CFR 50.30(a) · $151.00 proposed penalty

  6. Identification of power switches.

    violationRecord 5250037

    30 CFR 56.12018 · $151.00 proposed penalty

  7. Securing movable parts.

    violationRecord 5250036

    30 CFR 56.14206(b) · $151.00 proposed penalty

  8. Inspection and cover plates.

    violationRecord 5250035

    30 CFR 56.12032 · $151.00 proposed penalty

  9. Toilet facilities.

    violationRecord 5250034

    30 CFR 56.20008(b) · $151.00 proposed penalty

  10. High-pressure hose connections.

    violationRecord 5176979

    30 CFR 56.13021

  11. Controls and switches.

    violationRecord 5176978

    30 CFR 56.12002

  12. Housekeeping.

    violationRecord 5176977

    30 CFR 56.20003(a)

  13. Parking procedures for unattended equipment.

    violationRecord 5176976

    30 CFR 56.14207

  14. Safe access.

    violationRecord 5176975

    30 CFR 56.11001

  15. Brakes.

    violationRecord 5176974

    30 CFR 56.14101(a)(2) · Significant and substantial (S&S)

  16. Housekeeping.

    violationRecord 5176973

    30 CFR 56.20003(a) · Significant and substantial (S&S)

  17. Housekeeping.

    violationRecord 5176972

    30 CFR 56.20003(a)

  18. Regular Safety and Health Inspection

    inspectionRecord F04622C

    61.0 on-site hours reported

  19. Construction and maintenance of guards.

    violationRecord 5176971

    30 CFR 56.14112(b) · Significant and substantial (S&S)

  20. Securing movable parts.

    violationRecord 5176970

    30 CFR 56.14206(b) · $151.00 proposed penalty

  21. Safety defects; examination, correction and records.

    violationRecord 5176969

    30 CFR 56.14100(b) · $151.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5176968

    30 CFR 56.14100(a) · $151.00 proposed penalty

  23. Inspection.

    violationRecord 5176967

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  24. Handling of materials

    accidentRecord 220261820016

    Days restricted activity only

    Accident narrative

    Employee was pulling cable in upstream area and felt a pop in right shoulder when pulling back.

  25. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5173223

    30 CFR 48.7(a)(1) · Significant and substantial (S&S) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.