  1. Requirement for container labels.

    violationRecord 9799564

    30 CFR 47.41(a) · $697.00 proposed penalty

  2. Horns and backup alarms.

    violationRecord 9799563

    30 CFR 56.14132(b)(1)(i) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  3. Parking procedures for unattended equipment.

    violationRecord 9799562

    30 CFR 56.14207 · Significant and substantial (S&S) · $11,450.00 proposed penalty

  4. Verbal Hazard Complaint Inspections

    inspectionRecord F01717F

    2.0 on-site hours reported

  5. Compliance Follow-up Inspection

    inspectionRecord F038B41

    0.5 on-site hours reported

  6. Spot Inspection

    inspectionRecord 6934390

    5.5 on-site hours reported

  7. Moving machine parts.

    violationRecord 5007246

    30 CFR 56.14107(a) · $267.00 proposed penalty

  8. Violation — cited standard not reported

    violationRecord 5007245

    $168.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord 6934389

    1.0 on-site hours reported

  10. Compliance Follow-up Inspection

    inspectionRecord F020BEC

    1.0 on-site hours reported

  11. Inspection and cover plates.

    violationRecord 9797179

    30 CFR 56.12032

  12. Examination of working places.

    violationRecord 9797172

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  13. Inspection and cover plates.

    violationRecord 9797171

    30 CFR 56.12032 · $215.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 9797170

    30 CFR 56.14112(b) · $151.00 proposed penalty

  15. Protection for openings around travelways.

    violationRecord 9797169

    30 CFR 56.11012 · $151.00 proposed penalty

  16. Protection for openings around travelways.

    violationRecord 9797168

    30 CFR 56.11012 · Significant and substantial (S&S) · $432.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F015E50

    13.3 on-site hours reported

  18. Records of training.

    violationRecord 9797167

    30 CFR 46.9(b)(2) · $151.00 proposed penalty

  19. Moving machine parts.

    violationRecord 9797166

    30 CFR 56.14107(a) · $336.00 proposed penalty

  20. Moving machine parts.

    violationRecord 9797165

    30 CFR 56.14107(a) · $151.00 proposed penalty

  21. Moving machine parts.

    violationRecord 9797164

    30 CFR 56.14107(a) · $336.00 proposed penalty

  22. Construction and maintenance of ladders.

    violationRecord 9797163

    30 CFR 56.11003 · $336.00 proposed penalty

  23. Inspection and cover plates.

    violationRecord 9797162

    30 CFR 56.12032 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  24. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 9799866

    30 CFR 50.20(a) · $151.00 proposed penalty

  25. Preservation of evidence.

    violationRecord 9799865

    30 CFR 50.12 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.