← CHANUTE QUARRY

CHANUTE QUARRY safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Combustible waste.

    violationRecord 5045395

    30 CFR 56.4104(b) · $177.00 proposed penalty

  2. Regular Safety and Health Inspection

    inspectionRecord F009E9E

    146.5 on-site hours reported

  3. Machinery

    accidentRecord 220253170354

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee sustained a laceration to the left ring finger while attempting to remove a grinding-aid lance from #3 Finish Mill. Employee was taken to the ER for further evaluation and received 4 stitches.

  4. Compliance Follow-up Inspection

    inspectionRecord F02734B

    9.0 on-site hours reported

  5. High-pressure hose connections.

    violationRecord 5042090

    30 CFR 56.13021 · $245.00 proposed penalty

  6. Correction of dangerous conditions.

    violationRecord 5042089

    30 CFR 56.12030 · $245.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5042254

    30 CFR 56.14100(b) · $193.00 proposed penalty

  8. Illumination of surface working areas.

    violationRecord 5042253

    30 CFR 56.17001 · $193.00 proposed penalty

  9. Illumination of surface working areas.

    violationRecord 5042252

    30 CFR 56.17001 · $193.00 proposed penalty

  10. Safety defects; examination, correction and records.

    violationRecord 5042251

    30 CFR 56.14100(b) · $193.00 proposed penalty

  11. Controls and switches.

    violationRecord 5042088

    30 CFR 56.12002 · $642.00 proposed penalty

  12. Housekeeping.

    violationRecord 5043705

    30 CFR 56.20003(a) · $288.00 proposed penalty

  13. Inspection and cover plates.

    violationRecord 5043703

    30 CFR 56.12032 · $151.00 proposed penalty

  14. Moving machine parts.

    violationRecord 5043702

    30 CFR 56.14107(a) · $151.00 proposed penalty

  15. Safe access.

    violationRecord 5042250

    30 CFR 56.11001 · $193.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5043695

    30 CFR 56.14112(b) · $151.00 proposed penalty

  17. Inspection.

    violationRecord 5043692

    30 CFR 56.4201(a)(1) · $336.00 proposed penalty

  18. Safety defects; examination, correction and records.

    violationRecord 5043691

    30 CFR 56.14100(b) · $1,126.00 proposed penalty

  19. Prohibited areas for food and beverages.

    violationRecord 5043690

    30 CFR 56.20014 · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5043689

    30 CFR 56.14100(b) · $151.00 proposed penalty

  21. Safety defects; examination, correction and records.

    violationRecord 5043688

    30 CFR 56.14100(b) · $755.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5043687

    30 CFR 56.14100(b) · $1,126.00 proposed penalty

  23. Housekeeping.

    violationRecord 5043686

    30 CFR 56.20003(a) · $755.00 proposed penalty

  24. Spillage and leakage.

    violationRecord 5043685

    30 CFR 56.4102 · $151.00 proposed penalty

  25. Spillage and leakage.

    violationRecord 5043684

    30 CFR 56.4102 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.