Casey Stone Company safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord F006BD2

    9.0 on-site hours reported

  2. Housekeeping.

    violationRecord 5081927

    30 CFR 56.20003(a) · $151.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F025B07

    24.0 on-site hours reported

  4. Access to stationary electrical equipment or switchgear.

    violationRecord 5080615

    30 CFR 56.12019 · $151.00 proposed penalty

  5. Circuit overload protection.

    violationRecord 5080614

    30 CFR 56.12001 · $151.00 proposed penalty

  6. Insulation and fittings for power wires and cables.

    violationRecord 5080613

    30 CFR 56.12008 · $151.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F015D7B

    16.0 on-site hours reported

  8. Electrical conductors.

    violationRecord 5080607

    30 CFR 56.12004 · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F00743A

    7.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.