Carthage Crushed Limestone safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible exposure level.
30 CFR 62.130(a)
First aid.
30 CFR 57.18010
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S)
Moving machine parts.
30 CFR 57.14107(a)
Correction of hazardous conditions.
30 CFR 57.3200
Regular Safety and Health Inspection
16.5 on-site hours reported
Compliance Follow-up Inspection
0.0 on-site hours reported
Exposure limits for airborne contaminants.
30 CFR 57.5001(a)/.5005 · $193.00 proposed penalty
Training for mine rescue teams.
30 CFR 49.8(b)(1) · $1,431.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 57.14207 · $151.00 proposed penalty
Regular Safety and Health Inspection
22.0 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Closure of valves.
30 CFR 57.4603(b) · $336.00 proposed penalty
Protection of gas cylinder valves.
30 CFR 57.16006 · $336.00 proposed penalty
Underground self-propelled equipment.
30 CFR 57.4260(c) · $432.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $193.00 proposed penalty
Regular Safety and Health Inspection
17.5 on-site hours reported
Spot Inspection
2.3 on-site hours reported
Powered haulage
Days restricted activity only
Accident narrative
While operating a loader underground EE stated they hurt their lower back due to the uneven ground in the area where they were loading material. The EE was taken to the clinic where they were diagnosed with a lumbosacral strain in their lower back.
Handling of materials
Days away from work only
Accident narrative
While employee was attempting to open a pipe gate, middle finger on right hand got caught in between a cross piece and the lock on the gate. When the EE tried to pull their finger loose, they ended up pulling off the tip of their finger.
Housekeeping.
30 CFR 57.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 57.12008 · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.