Inspection.
30 CFR 57.4201(a)(2) · $177.00 proposed penalty
Construction and maintenance of guards.
30 CFR 57.14112(a)(1) · $151.00 proposed penalty
Escape routes.
30 CFR 57.11051(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 57.12008 · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $465.00 proposed penalty
Protection of power conductors from mobile equipment.
30 CFR 57.12005 · $151.00 proposed penalty
Regular Safety and Health Inspection
155.5 on-site hours reported
Hoisting
Accident only
Accident narrative
Lost power to all surface and underground operations, which caused us to lose hoisting capabilities. Issue was within the city of Cleveland. Notified Cleveland Public Power (CPP) of issue and proceeded to evacuate mine until power was restored.
Hoisting
Accident only
Accident narrative
The brake sensor on the Phoist malfunctioned. Upon investigation, we found that a wire was loose/disconnected and needed to be corrected.
Identification of power switches.
30 CFR 57.12018 · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $697.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Correction of dangerous conditions.
30 CFR 57.12030 · $151.00 proposed penalty
Identification of power switches.
30 CFR 57.12018 · $549.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $465.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $697.00 proposed penalty
Moving machine parts.
30 CFR 57.14107(a) · $151.00 proposed penalty
Warning signs.
30 CFR 57.4101 · $313.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $151.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $465.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 57.12008 · $313.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.