← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection of trailing cables.

    violationRecord 9989825

    30 CFR 75.606 · $245.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 9989824

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5041123

    30 CFR 75.202(a) · $267.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041122

    30 CFR 75.1731(a) · $288.00 proposed penalty

  5. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 9998432

    30 CFR 75.1103-4(b) · $151.00 proposed penalty

  6. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9998431

    30 CFR 75.1731(b) · $267.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 9989823

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 5041121

    30 CFR 75.1725(a) · $245.00 proposed penalty

  9. Violation — cited standard not reported

    violationRecord 9998430

    $168.00 proposed penalty

  10. Violation — cited standard not reported

    violationRecord 9998429

    $151.00 proposed penalty

  11. Mine emergency evacuation and firefighting program of instruction.

    violationRecord 9998428

    30 CFR 75.1502(c)(7) · $245.00 proposed penalty

  12. Roof control plan.

    violationRecord 9989822

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F00AE77

    103(i) · 5.8 on-site hours reported

  14. Roof control plan.

    violationRecord 9998427

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  15. Temporary, portable containers.

    violationRecord 9989712

    30 CFR 47.44(b) · $245.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9989711

    30 CFR 75.1731(b) · $151.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9989710

    30 CFR 75.1731(a) · $151.00 proposed penalty

  18. Installation of high-voltage transmission cables.

    violationRecord 9998426

    30 CFR 75.807 · $151.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 9998425

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  20. Air quantity.

    violationRecord 9998424

    30 CFR 75.325(f)(1) · $151.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 9989821

    30 CFR 75.400 · $398.00 proposed penalty

  22. Roof control plan.

    violationRecord 9989820

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5041181

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5041180

    30 CFR 75.512 · $288.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5041179

    30 CFR 75.512 · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.