  1. Roof control plan.

    violationRecord 5041107

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Roof control plan.

    violationRecord 5041106

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  3. Roof control plan.

    violationRecord 9998440

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  4. Maintenance of incombustible content of rock dust.

    violationRecord 9989713

    30 CFR 75.403 · $151.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9989619

    30 CFR 75.1731(b) · $151.00 proposed penalty

  6. On-shift examination.

    violationRecord 5041243

    30 CFR 75.362(a)(2) · $697.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5041242

    30 CFR 75.400 · $288.00 proposed penalty

  8. Roof control plan.

    violationRecord 5041241

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041105

    30 CFR 75.1731(a) · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9989618

    30 CFR 75.400 · $313.00 proposed penalty

  11. Installation of high-voltage transmission cables.

    violationRecord 9760419

    30 CFR 75.807 · $193.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 9989617

    30 CFR 75.503 · Significant and substantial (S&S) · $504.00 proposed penalty

  13. Mining methods.

    violationRecord 5041104

    30 CFR 75.203(b) · $193.00 proposed penalty

  14. Roof control plan.

    violationRecord 5041103

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5041102

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  16. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5041195

    30 CFR 75.1107-4(c) · $151.00 proposed penalty

  17. Power wires and cables; insulation and protection.

    violationRecord 5041194

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5041193

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  19. Methane monitors.

    violationRecord 5041192

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $697.00 proposed penalty

  20. Illumination.

    violationRecord 9998437

    30 CFR 77.207 · $151.00 proposed penalty

  21. Escapeway maps.

    violationRecord 9998436

    30 CFR 75.1505(b) · $245.00 proposed penalty

  22. Spot Inspections

    inspectionRecord 7041738

    103(i) · 8.0 on-site hours reported

  23. Ventilation controls.

    violationRecord 9998435

    30 CFR 75.333(h) · $151.00 proposed penalty

  24. Roof control plan.

    violationRecord 9998434

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  25. Installation of high-voltage transmission cables.

    violationRecord 9998433

    30 CFR 75.807 · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.