← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041207

    30 CFR 75.1731(a) · $226.00 proposed penalty

  2. On-shift examination.

    violationRecord 5041206

    30 CFR 75.362(b) · $697.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041205

    30 CFR 75.1731(b) · $697.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5041204

    30 CFR 75.400 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041203

    30 CFR 75.1731(a) · $755.00 proposed penalty

  6. Non-Injury Accident Investigation

    inspectionRecord F0053C3

    21.0 on-site hours reported

  7. Violation — cited standard not reported

    violationRecord 9760396
  8. Abatement of dust; water or water with a wetting agent.

    violationRecord 9760256

    30 CFR 75.401 · $151.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5041524

    30 CFR 75.1731(a) · $151.00 proposed penalty

  10. Roof control plan.

    violationRecord 5041202

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  11. Fall of roof or back

    accidentRecord 220251390018

    Accident only

    Accident narrative

    There was an unplanned roof fall in the #4 entry between crosscut 6 1/2 and 7 1/2 in the #9 1st South Corridor.

  12. Ventilation controls.

    violationRecord 9760226

    30 CFR 75.333(c)(2) · $151.00 proposed penalty

  13. Escapeway maps.

    violationRecord 5041201

    30 CFR 75.1505(b) · $151.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 9760255

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  15. Escapeway maps.

    violationRecord 9760254

    30 CFR 75.1505(b) · $193.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5041523

    30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5041522

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  18. Ventilation controls.

    violationRecord 5041521

    30 CFR 75.333(c)(2) · $151.00 proposed penalty

  19. Mine emergency evacuation training and drills.

    violationRecord 9989626

    30 CFR 75.1504(d) · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9989625

    30 CFR 75.400 · $398.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F004926

    103(i) · 6.0 on-site hours reported

  22. Preshift examination at fixed intervals.

    violationRecord 9760225

    30 CFR 75.360(b)(9) · $818.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9760224

    30 CFR 75.400 · $165.00 proposed penalty

  24. Dispensing of diesel fuel.

    violationRecord 9760223

    30 CFR 75.1905(b)(3)(ii) · $151.00 proposed penalty

  25. Roof bolting.

    violationRecord 9760428

    30 CFR 75.204(c)(1) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.