← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 9760261

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  2. Cable fittings; suitability.

    violationRecord 5041220

    30 CFR 75.515 · $245.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F00CC3D

    103(i) · 6.0 on-site hours reported

  4. Cleanup program.

    violationRecord 5041143

    30 CFR 75.400-2 · $245.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5041142

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5041141

    30 CFR 75.400 · $366.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5041219

    30 CFR 75.202(a) · $267.00 proposed penalty

  8. Installation of high-voltage transmission cables.

    violationRecord 5041218

    30 CFR 75.807 · $818.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5041147

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5041146

    30 CFR 75.202(a) · $267.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5041145

    30 CFR 75.202(a) · $267.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5041144

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  13. Clamping of trailing cables to equipment.

    violationRecord 9998664

    30 CFR 75.605 · $245.00 proposed penalty

  14. Automatic emergency-parking brakes.

    violationRecord 9998663

    30 CFR 75.523-3(b)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5041534

    30 CFR 75.400 · $366.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5041533

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  17. Preshift examination at fixed intervals.

    violationRecord 5041532

    30 CFR 75.360(b)(9) · $151.00 proposed penalty

  18. Machinery and equipment; operation and maintenance.

    violationRecord 5041217

    30 CFR 75.1725(a) · $245.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 5041216

    30 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty

  20. High-voltage underground equipment; grounding.

    violationRecord 5041140

    30 CFR 75.811 · $245.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9998662

    30 CFR 75.1731(a) · $336.00 proposed penalty

  22. Installation of water sprinkler systems; requirements.

    violationRecord 5041504

    30 CFR 75.1101-7(a) · $267.00 proposed penalty

  23. Roof control plan.

    violationRecord 5041215

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  24. Roof control plan.

    violationRecord 5041214

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5041213

    30 CFR 75.202(a) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.