← CARDINAL

CARDINAL safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F035D56

    103(i) · 7.3 on-site hours reported

  2. Roof control plan.

    violationRecord 5221263

    30 CFR 75.220(a)(1)

  3. Roof control plan.

    violationRecord 5221262

    30 CFR 75.220(a)(1)

  4. Permissible electric face equipment; maintenance.

    violationRecord 5221261

    30 CFR 75.503

  5. Spot Inspections

    inspectionRecord F020880

    103(i) · 8.0 on-site hours reported

  6. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5221206

    30 CFR 75.1714-3(b)

  7. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5047045

    30 CFR 75.1714-3(b)

  8. Fall of roof or back

    accidentRecord 220262710030

    Days away from work only

    Accident narrative

    Employee was between #2 and #3 entry on the #1 unit and had been arranging the supplies with their left hand resting on the side of the idle machine, when a piece of slate contacted their lower left arm resulting in a fracture.

  9. Mine ventilation plan; submission and approval.

    violationRecord 5048098

    30 CFR 75.370(a)(1)

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9760835

    30 CFR 75.1731(b)

  11. Roof testing and scaling.

    violationRecord 9760834

    30 CFR 75.211(b)(1)

  12. Permissible electric face equipment; maintenance.

    violationRecord 9760833

    30 CFR 75.503

  13. Escapeways; bituminous and lignite mines.

    violationRecord 5048097

    30 CFR 75.380(d)(7)(vi)

  14. Escapeways; bituminous and lignite mines.

    violationRecord 5048096

    30 CFR 75.380(d)(2)

  15. Slip or fall of person

    accidentRecord 220262880022

    Days away from work only

    Accident narrative

    Employee was exiting a tractor on the 630 bottom when they caught their right knee causing it to twist. They continued to work until 10/5/26 when it was determined that they would need a ligament in their right knee surgically repaired.

  16. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F035D55

    2.0 on-site hours reported

  17. Spot Inspections

    inspectionRecord F02087F

    103(i) · 9.0 on-site hours reported

  18. Methane monitors.

    violationRecord 5046922

    30 CFR 75.342(a)(4)

  19. Mine ventilation plan; submission and approval.

    violationRecord 5046921

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  20. Mine ventilation plan; submission and approval.

    violationRecord 5046920

    30 CFR 75.370(a)(1)

  21. Mine ventilation plan; submission and approval.

    violationRecord 5046919

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  22. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5046756

    30 CFR 75.1910(e)

  23. Spot Inspections

    inspectionRecord F02087E

    103(i) · 9.0 on-site hours reported

  24. Methane monitors.

    violationRecord 5046918

    30 CFR 75.342(a)(4) · Significant and substantial (S&S)

  25. Mine ventilation plan; submission and approval.

    violationRecord 5046917

    30 CFR 75.370(a)(1)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.