← Canaan

Canaan safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Flying or falling materials.

    violationRecord 5070766

    30 CFR 56.14110 · $226.00 proposed penalty

  2. Housekeeping.

    violationRecord 5070765

    30 CFR 56.20003(a) · $883.00 proposed penalty

  3. Construction and maintenance of guards.

    violationRecord 5070764

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  4. Moving machine parts.

    violationRecord 5070763

    30 CFR 56.14107(a) · $151.00 proposed penalty

  5. Construction and maintenance of ladders.

    violationRecord 5070762

    30 CFR 56.11003 · $151.00 proposed penalty

  6. Construction and maintenance of guards.

    violationRecord 5070761

    30 CFR 56.14112(b) · $336.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5070759

    30 CFR 56.14100(c) · $151.00 proposed penalty

  8. Compliance Follow-up Inspection

    inspectionRecord F01634D

    19.3 on-site hours reported

  9. Exposure limits for airborne contaminants.

    violationRecord 9807762

    30 CFR 56.5001(a)/56.5005 · $165.00 proposed penalty

  10. Exposure limits for airborne contaminants.

    violationRecord 9807761

    30 CFR 56.5001(a)/56.5005 · $165.00 proposed penalty

  11. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 9807757

    30 CFR 50.20(a) · $151.00 proposed penalty

  12. Inspection and cover plates.

    violationRecord 9807756

    30 CFR 56.12032 · $151.00 proposed penalty

  13. Inspection.

    violationRecord 9807755

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  14. Examination of working places.

    violationRecord 9807754

    30 CFR 56.18002(a)(1) · $151.00 proposed penalty

  15. Moving machine parts.

    violationRecord 9807753

    30 CFR 56.14107(a) · $151.00 proposed penalty

  16. Flying or falling materials.

    violationRecord 9807752

    30 CFR 56.14110 · $432.00 proposed penalty

  17. Horns and backup alarms.

    violationRecord 9807751

    30 CFR 56.14132(a) · $151.00 proposed penalty

  18. Housekeeping.

    violationRecord 9807750

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 9807749

    30 CFR 56.14112(b) · $151.00 proposed penalty

  20. Housekeeping.

    violationRecord 9807748

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  21. Snow and ice on walkways and travelways.

    violationRecord 9807747

    30 CFR 56.11016 · Significant and substantial (S&S) · $288.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord F017AED

    60.3 on-site hours reported

  23. Safety defects; examination, correction and records.

    violationRecord 9807746

    30 CFR 56.14100(c) · $151.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 9807745

    30 CFR 56.12032 · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.