Calvary No 81 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Violation — cited standard not reported
Ventilation controls.
30 CFR 75.333(b)(2) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $177.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $177.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $151.00 proposed penalty
Immediate notification.
30 CFR 50.10(b) · $7,555.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Non-Fatal Accident Investigation
29.5 on-site hours reported
Violation — cited standard not reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $177.00 proposed penalty
Powered haulage
Days away from work only
Accident narrative
EE and the scoop man were going to get the maintenance insert and some oil to take to the miner to service it. EE got in the bucket of the scoop between the insert and the ram. The scoop man backed up the heading and pulled up into 4 right to turn. As they pulled forward the insert contacted the rib, pushing it into EE.
Roof testing and scaling.
30 CFR 75.211(c) · Significant and substantial (S&S) · $697.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $209.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Injured and another employee was putting a set of scoop batteries on charge. Injured bent over to pick up the female end of the jumper cable when upon doing so, they felt a pain in their back going down right leg. We were not informed of the results from the specialist until 08/28/2025.
Roof testing and scaling.
30 CFR 75.211(c) · $151.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.