← BULLSKIN NO 1 MINE

BULLSKIN NO 1 MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord F03794E

    0.0 on-site hours reported

  2. Brakes.

    violationRecord 5120050

    30 CFR 57.14101(a)(2) · $151.00 proposed penalty

  3. Horns and backup alarms for surface equipment.

    violationRecord 5120049

    30 CFR 57.14132(a) · $151.00 proposed penalty

  4. Electrical conductors.

    violationRecord 5120048

    30 CFR 57.12004 · $151.00 proposed penalty

  5. Moving machine parts.

    violationRecord 5120047

    30 CFR 57.14107(a) · $151.00 proposed penalty

  6. Brakes.

    violationRecord 5120046

    30 CFR 57.14101(a)(2) · $151.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F037949

    29.5 on-site hours reported

  8. Spot Inspection

    inspectionRecord F033FB0

    1.5 on-site hours reported

  9. Ventilation plan.

    violationRecord 5075795

    30 CFR 57.8520(e) · $151.00 proposed penalty

  10. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5075794

    30 CFR 50.30(a) · $151.00 proposed penalty

  11. Brakes.

    violationRecord 5075793

    30 CFR 57.14101(a)(3) · $151.00 proposed penalty

  12. Housekeeping.

    violationRecord 5075792

    30 CFR 57.20003(a) · $151.00 proposed penalty

  13. Protection for openings around travelways.

    violationRecord 5075791

    30 CFR 57.11012 · $151.00 proposed penalty

  14. Barricades and warning signs.

    violationRecord 5075790

    30 CFR 57.20011 · $151.00 proposed penalty

  15. Identification of power switches.

    violationRecord 5075789

    30 CFR 57.12018 · $151.00 proposed penalty

  16. Correction of hazardous conditions.

    violationRecord 5075788

    30 CFR 57.3200 · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F03793A

    37.8 on-site hours reported

  18. Identification of power switches.

    violationRecord 5151103

    30 CFR 57.12018 · $151.00 proposed penalty

  19. Handrails and toeboards.

    violationRecord 5151102

    30 CFR 57.11002 · $151.00 proposed penalty

  20. Moving machine parts.

    violationRecord 5151101

    30 CFR 57.14107(a) · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F01ED17

    49.0 on-site hours reported

  22. Housekeeping.

    violationRecord 9604769

    30 CFR 56.20003(a) · $151.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F028288

    34.5 on-site hours reported

  24. Spot Inspection

    inspectionRecord 6229659

    4.5 on-site hours reported

  25. Handtools (nonpowered)

    accidentRecord 220252670004

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee using cutters punctured themselves in the hand with the cutters leading to a laceration of their left index finger.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.