Bull Mountains Mine No 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(e) · $226.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $209.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
High-voltage circuits; circuit breakers.
30 CFR 75.800 · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(c)(3) · $226.00 proposed penalty
Handtools (nonpowered)
Days away from work only
Accident narrative
While splicing cable, helper moved cable causing knife to slip and causing laceration to right top of hand, between thumb and index finger. Required four stitches with follow up with Ortho specialist.
Atmospheric monitoring systems.
30 CFR 75.351(q)(2) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(e) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(d) · $366.00 proposed penalty
Regular Safety and Health Inspection
286.5 on-site hours reported
Hazard training.
30 CFR 48.31(d) · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $6,037.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(c)(5) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.