← Bull Mountains Mine No 1

Bull Mountains Mine No 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Cable fittings; suitability.

    violationRecord 5034310

    30 CFR 75.515

  2. On-shift examination.

    violationRecord 5036170

    30 CFR 75.362(d)(1)(ii)

  3. Auxiliary fans and tubing.

    violationRecord 5036169

    30 CFR 75.331(a)(4)

  4. Escapeways; bituminous and lignite mines.

    violationRecord 5036168

    30 CFR 75.380(d)(4)

  5. Ventilation controls.

    violationRecord 5036167

    30 CFR 75.333(h)

  6. Mean entry air velocity.

    violationRecord 9732643

    30 CFR 75.326

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5038963

    30 CFR 75.1725(a)

  8. Mine ventilation map.

    violationRecord 5034581

    30 CFR 75.372(b)(12)

  9. Permissible electric face equipment; maintenance.

    violationRecord 5034308

    30 CFR 75.503

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5033815

    30 CFR 75.512

  11. Permissible electric face equipment; maintenance.

    violationRecord 9733083

    30 CFR 75.503

  12. Escapeways; bituminous and lignite mines.

    violationRecord 5034580

    30 CFR 75.380(d)(7)(i)

  13. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5034579

    30 CFR 75.1909(a)(3)(iii)

  14. Permissible electric face equipment; maintenance.

    violationRecord 9733082

    30 CFR 75.503

  15. Inspection of fire suppression devices.

    violationRecord 9733081

    30 CFR 75.1107-16(b)

  16. Permissible electric face equipment; maintenance.

    violationRecord 9733080

    30 CFR 75.503

  17. Dust accumulations in surface installations.

    violationRecord 9732642

    30 CFR 77.202

  18. Regular Safety and Health Inspection

    inspectionRecord F03EA03

    114.8 on-site hours reported

  19. Stationary grinding machines; protective devices.

    violationRecord 5034578

    30 CFR 75.1723(b)

  20. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5034577

    30 CFR 75.1909(d)

  21. Preshift examination at fixed intervals.

    violationRecord 5034576

    30 CFR 75.360(g)

  22. Atmospheric monitoring systems.

    violationRecord 5034220

    30 CFR 75.351(k) · $177.00 proposed penalty

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5034217

    30 CFR 75.1731(a) · $151.00 proposed penalty

  24. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9733073

    30 CFR 75.1909(c)(5) · $177.00 proposed penalty

  25. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9733072

    30 CFR 75.1911(i) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.