← Buffington Plant

Buffington Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Housekeeping.

    violationRecord 5119057

    30 CFR 56.20003(b) · $177.00 proposed penalty

  2. Annual refresher training.

    violationRecord 5118349

    30 CFR 46.8(a)(2) · $184.00 proposed penalty

  3. Procedures during repairs or maintenance.

    violationRecord 5118348

    30 CFR 56.14105 · Significant and substantial (S&S) · $818.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 5118347

    30 CFR 56.14100(c) · $592.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5118346

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  6. Housekeeping.

    violationRecord 5119056

    30 CFR 56.20003(a) · $1,219.00 proposed penalty

  7. Housekeeping.

    violationRecord 5119055

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty

  8. Waste receptacles.

    violationRecord 5118345

    30 CFR 56.20013 · $209.00 proposed penalty

  9. Construction and maintenance of ladders.

    violationRecord 5118344

    30 CFR 56.11003 · $209.00 proposed penalty

  10. Safety defects; examination, correction and records.

    violationRecord 5118343

    30 CFR 56.14100(c) · $209.00 proposed penalty

  11. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 5118342

    30 CFR 56.14130(i) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  12. Inspection and cover plates.

    violationRecord 5119054

    30 CFR 56.12032 · $366.00 proposed penalty

  13. Safe access.

    violationRecord 5119053

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  14. Safe access.

    violationRecord 5119052

    30 CFR 56.11001 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5119051

    30 CFR 56.12004 · $818.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5119050

    30 CFR 56.14112(a)(1) · $366.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 5119049

    30 CFR 56.14112(a)(1) · $165.00 proposed penalty

  18. High-pressure hose connections.

    violationRecord 5118341

    30 CFR 56.13021 · $245.00 proposed penalty

  19. Testing grounding systems.

    violationRecord 5118340

    30 CFR 56.12028 · $245.00 proposed penalty

  20. Correction of dangerous conditions.

    violationRecord 5118339

    30 CFR 56.12030 · $151.00 proposed penalty

  21. Inspection.

    violationRecord 5118338

    30 CFR 56.4201(a)(2) · $245.00 proposed penalty

  22. Testing grounding systems.

    violationRecord 5118337

    30 CFR 56.12028 · $245.00 proposed penalty

  23. Warning signs.

    violationRecord 5118336

    30 CFR 56.4101 · $245.00 proposed penalty

  24. Parking procedures for unattended equipment.

    violationRecord 5118335

    30 CFR 56.14207 · $151.00 proposed penalty

  25. Heat sources.

    violationRecord 5119048

    30 CFR 56.4500 · $465.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.