Brushy Creek Mine/Mill safety activity
MSHA violations, accident reports and inspections.
Safety activity
Operators' stations.
30 CFR 57.14103(b) · Significant and substantial (S&S) · $592.00 proposed penalty
Escapeways and refuges.
30 CFR 57.11050(a) · $398.00 proposed penalty
First aid materials.
30 CFR 57.15001 · $177.00 proposed penalty
Prohibited areas for food and beverages.
30 CFR 57.20014
Exposure monitoring.
30 CFR 57.5002 · $177.00 proposed penalty
Combustible waste.
30 CFR 57.4104(a) · $151.00 proposed penalty
Protection for openings around travelways.
30 CFR 57.11012 · $177.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · Significant and substantial (S&S) · $883.00 proposed penalty
High-pressure hose connections.
30 CFR 57.13021 · $151.00 proposed penalty
Splices and repairs of power cables.
30 CFR 57.12013(b) · $398.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
UNPLANNED ROOF FALL THAT IMPEDED PASSAGE ON THE MAIN ROADWAY IN THE NORTH PART OF THE MINE
Non-Injury Accident Investigation
24.5 on-site hours reported
Violation — cited standard not reported
Explosive material storage practices.
30 CFR 57.6102(a)(1) · $549.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · $245.00 proposed penalty
Regular Safety and Health Inspection
68.5 on-site hours reported
Unused explosive material.
30 CFR 57.6305 · $549.00 proposed penalty
Ventilation plan.
30 CFR 57.8520(b)(1) · $245.00 proposed penalty
Main facilities.
30 CFR 57.6160(a)(3) · $549.00 proposed penalty
Damaged or deteriorated explosive material.
30 CFR 57.6900 · $245.00 proposed penalty
Main facilities.
30 CFR 57.6160(b)(2)(i) · $549.00 proposed penalty
Limit on exposure to diesel particulate matter.
30 CFR 57.5060(b)(3)
Spot Inspection
9.5 on-site hours reported
Compliance Follow-up Inspection
28.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.