← BRUSH VALLEY

BRUSH VALLEY safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Flammable liquids; storage.

    violationRecord 9605395

    30 CFR 77.1103(d) · $151.00 proposed penalty

  2. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9603466

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9603465

    30 CFR 75.400 · $151.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603464

    30 CFR 75.1731(a) · $642.00 proposed penalty

  5. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603463

    30 CFR 75.1731(a) · $151.00 proposed penalty

  6. Roof control plan.

    violationRecord 9603462

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord 6245643

    397.0 on-site hours reported

  8. Escapeways; bituminous and lignite mines.

    violationRecord 9603735

    30 CFR 75.380(d)(6) · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9603734

    30 CFR 75.400 · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9603733

    30 CFR 75.400 · $165.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603732

    30 CFR 75.1731(b) · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9603731

    30 CFR 75.400 · $165.00 proposed penalty

  13. Escapeways; bituminous and lignite mines.

    violationRecord 9603730

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603729

    30 CFR 75.1731(a) · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 9605446

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9603460

    30 CFR 75.400 · $165.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603459

    30 CFR 75.1731(a) · $151.00 proposed penalty

  18. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9603458

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  19. Preshift examination at fixed intervals.

    violationRecord 9603457

    30 CFR 75.360(g) · $151.00 proposed penalty

  20. Temporary notations, revisions, and supplements.

    violationRecord 9603456

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 9603727

    30 CFR 75.517 · $151.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 9603726

    30 CFR 75.512 · $193.00 proposed penalty

  23. Identification of circuit breakers.

    violationRecord 9603723

    30 CFR 77.904 · $151.00 proposed penalty

  24. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 9605487

    30 CFR 48.7(a) · Significant and substantial (S&S) · $480.00 proposed penalty

  25. Performing work from a raised position; safeguards.

    violationRecord 9605486

    30 CFR 75.1726(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.