BRUSH VALLEY safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
0.0 on-site hours reported
Ventilation Technical Investigation
0.0 on-site hours reported
Spot Inspection
11.5 on-site hours reported
Violation — cited standard not reported
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
While drilling a hole in roof for a bolt, employee went to drop the steel out of the hole and the steel got caught, when they pulled on the steel it dropped hitting the drill head and bounced toward them. The steel struck their upper lip causing a laceration, resulting in three sutures.
Inspection of fire suppression devices.
30 CFR 75.1107-16(b)
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
Individual was striking a 6" water line coupler with a small sledgehammer to break it loose when it cracked, broke and a piece of the coupler struck them in lower lip, resulting in 2 sutures.
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $151.00 proposed penalty
Sampling; general and technical requirements.
30 CFR 70.201(c) · $151.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202-1(b)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Air quantity.
30 CFR 75.325(b) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(5) · $151.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(i) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(d) · $151.00 proposed penalty
Health Technical Investigation
15.0 on-site hours reported
Electrical Technical Investigation
8.0 on-site hours reported
Regular Safety and Health Inspection
155.8 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Roof Control Technical Investigation
8.0 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $151.00 proposed penalty
Health Technical Investigation
9.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.