  1. Safety belts and lines.

    violationRecord 9827297

    30 CFR 56.15005 · Significant and substantial (S&S) · $407.00 proposed penalty

  2. Violation — cited standard not reported

    violationRecord 9827296
  3. Housekeeping.

    violationRecord 9824906

    30 CFR 56.20003(a) · $5,574.00 proposed penalty

  4. Inspection.

    violationRecord 9824905

    30 CFR 56.4201(a)(2) · $313.00 proposed penalty

  5. Inspection.

    violationRecord 9824904

    30 CFR 56.4201(a)(1) · $313.00 proposed penalty

  6. Electric substations and liquid storage facilities.

    violationRecord 9827295

    30 CFR 56.4130(b) · $398.00 proposed penalty

  7. Electrical conductors.

    violationRecord 9827294

    30 CFR 56.12004 · $398.00 proposed penalty

  8. Access to stationary electrical equipment or switchgear.

    violationRecord 9827293

    30 CFR 56.12019 · $398.00 proposed penalty

  9. Inspection.

    violationRecord 9827292

    30 CFR 56.4201(a)(1) · $398.00 proposed penalty

  10. Safe access.

    violationRecord 9827291

    30 CFR 56.11001 · $883.00 proposed penalty

  11. Inspection and cover plates.

    violationRecord 9827289

    30 CFR 56.12032 · $398.00 proposed penalty

  12. Housekeeping.

    violationRecord 9824903

    30 CFR 56.20003(b) · $1,968.00 proposed penalty

  13. Barricades and warning signs.

    violationRecord 9824902

    30 CFR 56.20011 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  14. Protective equipment or clothing for welding, cutting, or working with molten metal.

    violationRecord 9824900

    30 CFR 56.15007 · Significant and substantial (S&S) · $432.00 proposed penalty

  15. Protective equipment or clothing for welding, cutting, or working with molten metal.

    violationRecord 9824899

    30 CFR 56.15007 · Significant and substantial (S&S) · $432.00 proposed penalty

  16. Label contents.

    violationRecord 9821892

    30 CFR 47.42(b) · $177.00 proposed penalty

  17. Spillage and leakage.

    violationRecord 9821891

    30 CFR 56.4102 · $177.00 proposed penalty

  18. Safety defects; examination, correction and records.

    violationRecord 9821890

    30 CFR 56.14100(b) · $151.00 proposed penalty

  19. Safe access.

    violationRecord 9827288

    30 CFR 56.11001 · $1,126.00 proposed penalty

  20. Testing grounding systems.

    violationRecord 9827287

    30 CFR 56.12028 · $504.00 proposed penalty

  21. Testing grounding systems.

    violationRecord 9827286

    30 CFR 56.12028 · $504.00 proposed penalty

  22. Inspection.

    violationRecord 9827285

    30 CFR 56.4201(a)(1) · $504.00 proposed penalty

  23. Testing grounding systems.

    violationRecord 9827284

    30 CFR 56.12028 · $504.00 proposed penalty

  24. Access to stationary electrical equipment or switchgear.

    violationRecord 9827283

    30 CFR 56.12019 · $504.00 proposed penalty

  25. Insulation and fittings for power wires and cables.

    violationRecord 9827282

    30 CFR 56.12008 · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.