← Brooksville South Cement Plant

Brooksville South Cement Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F02CAC7

    1.8 on-site hours reported

  2. Verbal Hazard Complaint Inspections

    inspectionRecord F0189FE

    3.0 on-site hours reported

  3. Exposure limits for airborne contaminants.

    violationRecord 5063586

    30 CFR 56.5001(a)/56.5005 · $642.00 proposed penalty

  4. Exposure limits for airborne contaminants.

    violationRecord 5063585

    30 CFR 56.5001(a)/56.5005 · $642.00 proposed penalty

  5. Testing grounding systems.

    violationRecord 5064613

    30 CFR 56.12028 · $6,037.00 proposed penalty

  6. Housekeeping.

    violationRecord 5064612

    30 CFR 56.20003(a) · $2,312.00 proposed penalty

  7. Housekeeping.

    violationRecord 5064611

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty

  8. Flying or falling materials.

    violationRecord 5064610

    30 CFR 56.14110 · $642.00 proposed penalty

  9. Housekeeping.

    violationRecord 5064609

    30 CFR 56.20003(a) · $2,312.00 proposed penalty

  10. Warning signs.

    violationRecord 5064608

    30 CFR 56.4101 · $642.00 proposed penalty

  11. Securing gas cylinders.

    violationRecord 5064607

    30 CFR 56.16005 · $642.00 proposed penalty

  12. Combustible waste.

    violationRecord 5064606

    30 CFR 56.4104(b) · $642.00 proposed penalty

  13. Housekeeping.

    violationRecord 5063576

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 5063575

    30 CFR 56.14100(c) · $642.00 proposed penalty

  15. Construction and maintenance of guards.

    violationRecord 5063574

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5063573

    30 CFR 56.14112(a)(1) · $642.00 proposed penalty

  17. Permissible exposure level.

    violationRecord 5063567

    30 CFR 62.130(a) · $959.00 proposed penalty

  18. Permissible exposure level.

    violationRecord 5063566

    30 CFR 62.130(a) · $959.00 proposed penalty

  19. Examination of working places.

    violationRecord 5063565

    30 CFR 56.18002(b) · $592.00 proposed penalty

  20. Correction of dangerous conditions.

    violationRecord 5063564

    30 CFR 56.12030 · $15,768.00 proposed penalty

  21. Permissible exposure level.

    violationRecord 5063563

    30 CFR 62.130(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  22. Containers for hazardous materials.

    violationRecord 5063562

    30 CFR 56.16004 · $642.00 proposed penalty

  23. Securing movable parts.

    violationRecord 5063561

    30 CFR 56.14206(b) · $642.00 proposed penalty

  24. Housekeeping.

    violationRecord 5063560

    30 CFR 56.20003(a) · $2,312.00 proposed penalty

  25. Securing gas cylinders.

    violationRecord 5063559

    30 CFR 56.16005 · $642.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.