  1. Spot Inspection

    inspectionRecord F043EE2

    7.5 on-site hours reported

  2. Electric equipment; frequency of examination and testing.

    violationRecord 5088587

    30 CFR 77.502-2 · $151.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 5088583

    30 CFR 77.512 · $151.00 proposed penalty

  4. Cable fittings; suitability.

    violationRecord 5088582

    30 CFR 77.505 · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F01201D

    56.5 on-site hours reported

  6. Spot Inspection

    inspectionRecord F01200E

    11.5 on-site hours reported

  7. Travelways at surface installations.

    violationRecord 5088556

    30 CFR 77.205(e) · $151.00 proposed penalty

  8. Accumulations of combustible materials.

    violationRecord 5088555

    30 CFR 77.1104 · $151.00 proposed penalty

  9. Cable fittings; suitability.

    violationRecord 5088716

    30 CFR 77.505 · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord 7046699

    53.0 on-site hours reported

  11. Accumulations of combustible materials.

    violationRecord 5088715

    30 CFR 77.1104 · $151.00 proposed penalty

  12. Travelways at surface installations.

    violationRecord 5088714

    30 CFR 77.205(a) · Significant and substantial (S&S) · $288.00 proposed penalty

  13. Accumulations of combustible materials.

    violationRecord 5088713

    30 CFR 77.1104 · $151.00 proposed penalty

  14. Mechanical equipment guards.

    violationRecord 5088712

    30 CFR 77.400(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  15. Identification of circuit breakers.

    violationRecord 5088711

    30 CFR 77.904 · $151.00 proposed penalty

  16. Special Emphasis Programs

    inspectionRecord F00686B

    1.0 on-site hours reported

  17. Machinery and equipment; operation and maintenance.

    violationRecord 9287689

    30 CFR 77.404(a) · $151.00 proposed penalty

  18. Machinery and equipment; operation and maintenance.

    violationRecord 9287688

    30 CFR 77.404(a) · $151.00 proposed penalty

  19. Inspection and cover plates.

    violationRecord 9287687

    30 CFR 77.512 · Significant and substantial (S&S) · $193.00 proposed penalty

  20. Surface installations; general.

    violationRecord 9287686

    30 CFR 77.200 · Significant and substantial (S&S) · $193.00 proposed penalty

  21. Insulating mats at power switches.

    violationRecord 9287685

    30 CFR 77.513 · $151.00 proposed penalty

  22. Cable fittings; suitability.

    violationRecord 9287684

    30 CFR 77.505 · $151.00 proposed penalty

  23. Insulating mats at power switches.

    violationRecord 9287683

    30 CFR 77.513 · $151.00 proposed penalty

  24. Insulating mats at power switches.

    violationRecord 9287682

    30 CFR 77.513 · $151.00 proposed penalty

  25. Examination and maintenance of firefighting equipment.

    violationRecord 9287681

    30 CFR 77.1110 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.