← BPM Lovell Mill

BPM Lovell Mill safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Insulation and fittings for power wires and cables.

    violationRecord 5033550

    30 CFR 56.12008 · $151.00 proposed penalty

  2. Parking procedures for unattended equipment.

    violationRecord 5033549

    30 CFR 56.14207 · $151.00 proposed penalty

  3. Self-propelled equipment.

    violationRecord 5033548

    30 CFR 56.4230(a)(1) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F0030F8

    19.0 on-site hours reported

  5. Other

    accidentRecord 220261380008

    Injuries due to natural causes

    Accident narrative

    Personal Health Issue not due to any chemical or physical factor from the mine. Only one person affected by this personal medical condition.

  6. Verbal Hazard Complaint Inspections

    inspectionRecord F00F378

    1.5 on-site hours reported

  7. Testing grounding systems.

    violationRecord 5038882

    30 CFR 56.12028 · $151.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5038881

    30 CFR 56.12004 · $151.00 proposed penalty

  9. Horns and backup alarms.

    violationRecord 5038880

    30 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F03AB01

    14.8 on-site hours reported

  11. Conveyor start-up warnings.

    violationRecord 9731180

    30 CFR 56.14201(b) · $151.00 proposed penalty

  12. Insulation and fittings for power wires and cables.

    violationRecord 9731179

    30 CFR 56.12008 · $151.00 proposed penalty

  13. Correction of dangerous conditions.

    violationRecord 9731178

    30 CFR 56.12030 · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord 6469041

    13.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.