← Blue Rapids Mine and Mill

Blue Rapids Mine and Mill safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Examination of working places.

    violationRecord 5042177

    30 CFR 57.18002(a) · $151.00 proposed penalty

  2. Parking procedures for unattended equipment.

    violationRecord 5042176

    30 CFR 57.14207 · $151.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 5042175

    30 CFR 57.12032 · $336.00 proposed penalty

  4. Machinery, equipment, and tools.

    violationRecord 5042174

    30 CFR 57.14205 · $151.00 proposed penalty

  5. Safe access.

    violationRecord 5042173

    30 CFR 57.11001 · $151.00 proposed penalty

  6. Correction of dangerous conditions.

    violationRecord 9765597

    30 CFR 56.12030 · $151.00 proposed penalty

  7. Spillage and leakage.

    violationRecord 5042169

    30 CFR 57.4102 · $151.00 proposed penalty

  8. High-potential electrical conductors.

    violationRecord 9765596

    30 CFR 57.12011 · $398.00 proposed penalty

  9. Escape routes.

    violationRecord 5042172

    30 CFR 57.11051(b) · $398.00 proposed penalty

  10. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5042171

    30 CFR 48.7(a)(1) · $398.00 proposed penalty

  11. Grounding circuit enclosures.

    violationRecord 5042170

    30 CFR 57.12025 · $151.00 proposed penalty

  12. Testing grounding systems.

    violationRecord 5042168

    30 CFR 57.12028 · $151.00 proposed penalty

  13. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5042167

    30 CFR 48.7(b) · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F013C02

    41.0 on-site hours reported

  15. Inspection.

    violationRecord 5043409

    30 CFR 57.4201(a)(2) · $151.00 proposed penalty

  16. Testing grounding systems.

    violationRecord 5043408

    30 CFR 57.12028 · $226.00 proposed penalty

  17. Flying or falling materials.

    violationRecord 5043407

    30 CFR 57.14110 · $151.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 5043406

    30 CFR 57.12028 · $226.00 proposed penalty

  19. Testing grounding systems.

    violationRecord 5043405

    30 CFR 57.12028 · $226.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord F01489D

    13.8 on-site hours reported

  21. Compliance Follow-up Inspection

    inspectionRecord F019113

    3.5 on-site hours reported

  22. Equipment and maintenance requirements.

    violationRecord 5041387

    30 CFR 49.6(b) · $151.00 proposed penalty

  23. Distribution boxes.

    violationRecord 9766698

    30 CFR 57.12006 · $288.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 9766697

    30 CFR 57.12032 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  25. Machinery, equipment, and tools.

    violationRecord 9766696

    30 CFR 57.14205 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.