Blue Creek No. 1 UG Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $193.00 proposed penalty
Regular Safety and Health Inspection
252.8 on-site hours reported
Violation — cited standard not reported
Non-Injury Accident Investigation
29.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $165.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $245.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $398.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Regular Safety and Health Inspection
235.0 on-site hours reported
Map of electrical system.
30 CFR 75.508 · $151.00 proposed penalty
Installation of water sprinkler systems; requirements.
30 CFR 75.1101-7(b) · $432.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Spot Inspection
9.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.