Blue Creek Mine No. 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $883.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $883.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $883.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $755.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Spot Inspections
103(i) · 8.5 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Mining machines, cap lamps; requirements.
30 CFR 75.1719-4(b) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii)(B) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $883.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(1) · $465.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(1) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.