← Blue Creek Mine No. 1

Blue Creek Mine No. 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways; bituminous and lignite mines.

    violationRecord 5060612

    30 CFR 75.380(d)(7)(vii)(B) · $226.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5060611

    30 CFR 75.202(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 5060610

    30 CFR 75.380(d)(5) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  4. Escapeways; bituminous and lignite mines.

    violationRecord 5060609

    30 CFR 75.380(d)(7)(iii) · $151.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5060608

    30 CFR 75.202(a) · Significant and substantial (S&S) · $245.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9826555

    30 CFR 75.400 · $151.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 9826554

    30 CFR 75.1725(a) · $549.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 9826553

    30 CFR 75.1725(a) · $549.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9826552

    30 CFR 75.1731(b) · $151.00 proposed penalty

  10. Ventilation controls.

    violationRecord 9826551

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  11. Roof control plan.

    violationRecord 9826550

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  12. Ventilation controls.

    violationRecord 9826549

    30 CFR 75.333(h) · $151.00 proposed penalty

  13. Ventilation controls.

    violationRecord 9826548

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  14. Roof control plan.

    violationRecord 9826547

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9826546

    30 CFR 75.400 · $151.00 proposed penalty

  16. Machinery and equipment; operation and maintenance.

    violationRecord 9826545

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9826544

    30 CFR 75.400 · $151.00 proposed penalty

  18. Machinery and equipment; operation and maintenance.

    violationRecord 9826543

    30 CFR 75.1725(a) · $151.00 proposed penalty

  19. Ventilation controls.

    violationRecord 9826542

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  20. Roof control plan.

    violationRecord 9826541

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  21. Roof bolting.

    violationRecord 9826540

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  22. Roof control plan.

    violationRecord 9826539

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  23. Roof control plan.

    violationRecord 9826538

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  24. Roof bolting.

    violationRecord 9826537

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  25. Quarterly sampling; designated areas.

    violationRecord 9820727

    30 CFR 70.209(a) · Significant and substantial (S&S) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.