← Blue Creek Mine No. 1

Blue Creek Mine No. 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5062610

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $592.00 proposed penalty

  2. Roof bolting.

    violationRecord 5062609

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5062608

    30 CFR 75.1731(b) · Significant and substantial (S&S) · $549.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 5062607

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  5. Roof control plan.

    violationRecord 5062606

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5062605

    30 CFR 75.400 · Significant and substantial (S&S) · $549.00 proposed penalty

  7. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062402

    30 CFR 75.1910(f) · $151.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 5061424

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  9. Power wires; support.

    violationRecord 5061423

    30 CFR 75.516 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5061422

    30 CFR 75.400 · $151.00 proposed penalty

  11. Roof bolting.

    violationRecord 5061421

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  12. Roof bolting.

    violationRecord 9826600

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  13. Ventilation controls.

    violationRecord 9826599

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  14. Roof control plan.

    violationRecord 9826598

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9826597

    30 CFR 75.400 · $151.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 9826596

    30 CFR 75.202(a) · $151.00 proposed penalty

  17. Roof control plan.

    violationRecord 9826595

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $549.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 9828880

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $818.00 proposed penalty

  19. Weekly examination.

    violationRecord 9828879

    30 CFR 75.364(g) · $151.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 9821729

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  21. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9828878

    30 CFR 75.1909(j)(2) · Significant and substantial (S&S) · $818.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 9828877

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9828876

    30 CFR 75.202(a) · $151.00 proposed penalty

  24. Ventilation controls.

    violationRecord 9828875

    30 CFR 75.333(h) · $151.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 9828874

    30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.