← Blue Creek Mine No. 1

Blue Creek Mine No. 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5062623

    30 CFR 75.400 · $151.00 proposed penalty

  2. Escapeway maps.

    violationRecord 5062622

    30 CFR 75.1505(b) · $151.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5062621

    30 CFR 75.202(a) · $151.00 proposed penalty

  4. Mechanical equipment guards.

    violationRecord 9828886

    30 CFR 75.1722(b) · $151.00 proposed penalty

  5. Mobile equipment; automatic warning devices.

    violationRecord 5060711

    30 CFR 77.410(c) · $151.00 proposed penalty

  6. Mobile equipment; automatic warning devices.

    violationRecord 5060710

    30 CFR 77.410(c) · $151.00 proposed penalty

  7. Methane monitors.

    violationRecord 9828885

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  8. Roof control plan.

    violationRecord 5062620

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  9. Ventilation controls.

    violationRecord 5062619

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  10. Roof control plan.

    violationRecord 5062618

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5062617

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5062616

    30 CFR 75.400 · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5062615

    30 CFR 75.400 · $151.00 proposed penalty

  14. Roof bolting.

    violationRecord 5062614

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  15. Other safeguards.

    violationRecord 9828884

    30 CFR 75.1403

  16. Other safeguards.

    violationRecord 9828883

    30 CFR 75.1403

  17. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9828882

    30 CFR 75.1909(j)(2) · Significant and substantial (S&S) · $818.00 proposed penalty

  18. Roof control plan.

    violationRecord 9827112

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 9824124

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 9824123

    30 CFR 75.503 · $165.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5062613

    30 CFR 75.202(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5062612

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5062407

    30 CFR 75.400 · $151.00 proposed penalty

  24. Power wires and cables; insulation and protection.

    violationRecord 5062406

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5062405

    30 CFR 75.400 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.