← BLACK EAGLE

BLACK EAGLE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020134

    30 CFR 75.1731(a) · $151.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F00C0AE

    103(i) · 7.0 on-site hours reported

  3. Roof testing and scaling.

    violationRecord 9847593

    30 CFR 75.211(d) · $313.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 9847592

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  5. Maintenance of incombustible content of rock dust.

    violationRecord 5020305

    30 CFR 75.403 · $151.00 proposed penalty

  6. Maintenance of incombustible content of rock dust.

    violationRecord 5020304

    30 CFR 75.403 · $151.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5020132

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F00C0AD

    103(i) · 6.0 on-site hours reported

  9. Methane monitors.

    violationRecord 9847591

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020131

    30 CFR 75.1731(a) · $151.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020130

    30 CFR 75.1731(a) · $151.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020129

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Ventilation controls.

    violationRecord 5020303

    30 CFR 75.333(c)(1) · $267.00 proposed penalty

  14. Temporary notations, revisions, and supplements.

    violationRecord 5020302

    30 CFR 75.1202-1(b)(3) · $267.00 proposed penalty

  15. Ventilation controls.

    violationRecord 5020301

    30 CFR 75.333(b)(1) · $883.00 proposed penalty

  16. Roof control plan.

    violationRecord 5020300

    30 CFR 75.220(a)(1) · $4,749.00 proposed penalty

  17. Weekly examination.

    violationRecord 5020299

    30 CFR 75.364(b)(2) · $2,936.00 proposed penalty

  18. Maintenance of incombustible content of rock dust.

    violationRecord 5020298

    30 CFR 75.403 · $336.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5020297

    30 CFR 75.403 · $336.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F00C0AC

    103(i) · 5.5 on-site hours reported

  21. Roof control plan.

    violationRecord 9847589

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 9847588

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F007052

    103(i) · 6.5 on-site hours reported

  24. Ventilation controls.

    violationRecord 5020296

    30 CFR 75.333(h) · $151.00 proposed penalty

  25. Weekly examination.

    violationRecord 5020295

    30 CFR 75.364(h) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.