← BLACK EAGLE

BLACK EAGLE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6322027

    103(i) · 10.0 on-site hours reported

  2. Roof control plan.

    violationRecord 5020658

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5020657

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  4. Roof control plan.

    violationRecord 5020656

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5021605

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5021604

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5021603

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5020655

    30 CFR 75.517 · Significant and substantial (S&S) · $6,540.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5020654

    30 CFR 75.400 · $642.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5020653

    30 CFR 75.512 · $883.00 proposed penalty

  11. Spot Inspections

    inspectionRecord 6322026

    103(i) · 9.0 on-site hours reported

  12. Protection from falls of roof, face and ribs.

    violationRecord 5021602

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5020652

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  14. Other safeguards.

    violationRecord 5020651

    30 CFR 75.1403 · $504.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F008731

    103(i) · 3.0 on-site hours reported

  16. Roof control plan-approval criteria.

    violationRecord 5023920

    30 CFR 75.222(b)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5023919

    30 CFR 75.400 · $642.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5023918

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5023917

    30 CFR 75.400 · $2,503.00 proposed penalty

  20. Power wires and cables; insulation and protection.

    violationRecord 5023916

    30 CFR 75.517 · $13,436.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 5023915

    30 CFR 75.360(a)(2) · $13,436.00 proposed penalty

  22. Respirable dust control plan; approval by District Manager; copy to part 90 miner.

    violationRecord 5022012

    30 CFR 90.301(c) · $465.00 proposed penalty

  23. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5021601

    30 CFR 75.1106-3(a)(2) · $465.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020650

    30 CFR 75.1731(a) · $177.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5020649

    30 CFR 75.202(a) · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.