Bishop Impoundment Area safety activity
MSHA violations, accident reports and inspections.
Safety activity
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(e) · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(d) · $151.00 proposed penalty
Openings in surface installations; safeguards.
30 CFR 77.204 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(b) · $151.00 proposed penalty
Openings in surface installations; safeguards.
30 CFR 77.204 · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Illumination.
30 CFR 77.207 · $151.00 proposed penalty
Openings in surface installations; safeguards.
30 CFR 77.204 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(cc) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · Significant and substantial (S&S) · $755.00 proposed penalty
Draw-off tunnels; stockpiling and reclaiming operations; general.
30 CFR 77.211(b) · $336.00 proposed penalty
Draw-off tunnels; stockpiling and reclaiming operations; general.
30 CFR 77.211(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
30 CFR 77.1713(a) · Significant and substantial (S&S) · $6,194.00 proposed penalty
Hazard training.
30 CFR 48.31(a) · Significant and substantial (S&S) · $1,866.00 proposed penalty
Experienced miner training.
30 CFR 48.26(b) · Significant and substantial (S&S) · $1,866.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.